How to Compare Contractor Bids

See what each warehouse quote covers and what to inspect before you pay.

Two contractors can quote different prices for the same warehouse. One prices the steel frame and roof. The other also includes the concrete floor and a drain connected to the existing catch basin. Ask each bidder to list what its price covers and mark the end of the drain on the drawing. If a quote leaves out work you need, get a price for that work before comparing totals.

Give Bidders the Same Brief

Describe the Warehouse

Tell bidders what you will store, which forklifts you use, where delivery vehicles enter and when the warehouse needs to open. The design team can use this information to plan the floor, door openings and turning space. Give every bidder the same site plan, access photos and working-hour restrictions.

Mark the Scope

Issue the same dated drawing revision to every bidder, along with the bill of quantities (BOQ) if you have one. Ask bidders to mark which floor areas they have priced and where their drainage allowance ends. For any item they can only estimate, ask what quantity they assumed.

Where does the drainage work end?
  • At the building line. If the quote stops at the dashed line, ask for a separate price for the external drain and its connection to the existing catch basin.
  • At the catch basin. Ask the bidder to mark the connection on the drawing and confirm that the quote covers both the external drain and the connection.

Compare Bids for the Same Work

Suppose you need a warehouse with a concrete floor and a drain connected to the existing catch basin shown above. Bid A covers the steel frame and roof. Bid B also covers the floor and drainage through to the connection. This example assumes matching quantities, material specifications and tax treatment.

Amounts in Thai baht (THB)
ItemBid ABid B
Quoted price2,400,0002,750,000
Floor and drainage to add420,000Included in bid
Total for the same scope2,820,0002,750,000

Bid A starts THB 350,000 below Bid B. Once you add THB 420,000 for the floor and drainage, Bid A costs THB 70,000 more. If the additional cost is still an estimate, get a quote for the missing work before you decide. Then compare the handover dates, payment milestones and warranty terms.

Who Will Run Your Site?

Meet the person who would supervise your warehouse and ask them to walk you through one project of a similar size or with similar site constraints. If construction will take place beside an operating factory, ask to see how they kept delivery trucks apart from staff on foot. Then ask: “Which part of this plan did you manage yourself, and what did you change once work began?”

For your own project, agree who will be on site when deliveries share the factory entrance and whom you can contact directly. If two drawings show different locations for the same item, establish who records the conflict, who can confirm which drawing to follow and who issues it to the crew before that work starts.

What to Check Before Paying

Inspect Before Covering Up

Arrange for the site supervisor to inspect the locations marked on the drawing before concrete is poured or a pipe trench is backfilled. Record the date and findings, and take photos that identify each location. Assign any corrections to a named person and reinspect while the work is still visible.

Check the Net Change

If you add a loading door after approving the drawings, ask how the frame and structural steel will change, how much it will cost and whether it affects handover. Show any credit for work removed on the same change order. Have the agreed decision-maker approve it before materials are ordered, then check the net amount against the payment claim.

Example: Checking a drainage payment claim Suppose the claim says the drain reaches the existing catch basin. Find the endpoint on the drawing, then compare it with the inspection record from before backfilling and a photo of the connection. If the drain stops at the building line, record what remains. Check whether the agreed milestone allows partial payment or requires the connection to be complete before approving the amount due.

Before Warehouse Handover

Walk the site with the contractor using the agreed drawings and scope. Open and close the loading door, then measure its clear width and height when fully open against the drawing. Follow the drain to the existing catch basin and ask for test records that identify the system and location tested. For each defect, record the location, photo, person responsible and reinspection date. Add the outcome when you revisit it.

Before approving the final payment, check the documents against the handover list in the contract. Verify that the as-built drawings show the installed pipe routes and connections, that the manuals match the equipment models and that the warranty documents give the coverage period and repair contact. Pass the set to the person who will maintain the warehouse.

Frequently Asked Questions

Can I get a quote before I have drawings?

You can request a budget estimate. Give the contractor the approximate warehouse size, intended use and site photos. Ask what is included and what information is still needed. For example, the floor price may depend on the loads it must carry. Once the drawings and materials are settled, send each bidder the same documents for a revised quote.

How do labour-only and supply-and-install bids differ?

In a supply-and-install bid, the contractor provides the agreed materials and includes the labour in its price. With a labour-only bid, the owner generally buys the materials and arranges delivery in time for installation. Ask each bidder who pays for transport, unloading and tools so you can include those costs in your comparison.

What should I check before approving a substitute material?

Ask for the model and specifications of both the original and the substitute. For roofing sheets, compare thickness, coating and warranty terms, along with any price difference or change to delivery dates. If the substitution affects the design or how the building will be used, get the responsible designer to review it. Record the approval before ordering.

How do I report a problem after handover?

Use the contact listed in the warranty documents. State the location, date and what you observed, such as water dripping beside the loading door after rain. Take a wide photo to identify the location and a close-up to show the problem. Ask for an inspection date, then keep the repair record and retest results with the handover documents.