PEB Steel Roofs: Plans and Quotes
Check clearances, roof framing and what each installer has priced.
Before requesting a quote for a roof over a warehouse loading bay, mark where trucks turn and reverse up to the dock. Give the designer the height of the tallest loaded vehicle so the columns and overhead services leave the route clear. On the same plan, mark where the rainwater should go. Ask every bidder whether the drainage work ends at the downpipe or includes the connecting pipe to that point.
How the Roof Carries Its Load
PEB stands for pre-engineered building. Its components are designed to work together, fabricated to the drawings and assembled on site. Start at the roof surface: the sheets are fastened to purlins that span between the main frames. The purlins transfer the roof load to the rafters, which carry it to the columns. Bracing stabilises the frame as designed.
What to Send With the Drawings
Compare Quotes on the Same Scope
Suppose two contractors price a loading-bay roof from the same drawings. Bid A delivers the steel frame to site. Bid B includes the frame and roof covering. Check who supplies the materials, unloads the truck and installs each component before comparing totals.
| Item | Bid A Frame delivered | Bid B Frame and covering |
|---|---|---|
| Steel frame | Rafters, purlins and bracing as drawn. | Rafters, purlins and bracing as drawn. |
| Sheets and flashings | Frame only. Add sheets, flashings and installation. | Sheets and roofing labour included. Confirm the sheet specification and the supply and fitting of flashings. |
| Delivery and erection | Delivery included. Price unloading and frame erection separately. | Erection included. Confirm transport, crane hire and unloading. |
| Rainwater drainage | Add the gutter, downpipe and connection to the catch basin on the plan. | Confirm whether the work ends at the downpipe or reaches the same catch basin. |
Ask whether the 600 m² is measured in plan or along the roof slope. If the bidders used different methods, have them price the same quantity. Get prices for the missing work in Bid A and written confirmation of transport, lifting and flashings in Bid B. Then compare both totals for an installed roof draining to the same catch basin.
What to Check at Handover
Truck clearance
Walk the truck route with the site supervisor. Measure between the inside faces of the columns and from the finished floor to the lowest overhead obstruction. Record the measurements on the plan and compare them with the approved drawings.
Drainage route
Follow the gutter to the downpipe with the drainage plan in hand. Check that the discharge point is where the parties agreed and photograph the endpoint of the contractor’s work.
Handover records
Check the contract list against the as-built drawings and inspection records for the frame, connections and roofing. Read the warranty scope and term, and keep the repair contact details with the warranty.
Outstanding work
If you find water staining where the roof meets the warehouse, photograph it and mark the location on the plan. Record who will address it and when to reinspect. At the follow-up, note whether more work is needed or the item can be closed.
Frequently Asked Questions
Can I get a roof-only quote for existing concrete columns?
Yes. Send the roof designer the existing column and foundation drawings and identify any gaps. Before ordering the steel, ask the designer to state the reactions at each support. A structural engineer can then check whether the existing columns, foundations and fixings can carry those loads.
Does a PEB frame quote include roof sheets and installation?
It depends on the scope. Look for rafters, purlins and bracing, then check separately for metal sheets, flashings and roofing labour. If a bidder lists only a “roof package”, ask for an itemised breakdown of materials and labour before comparing totals.
Which records should I keep for a future solar installation?
Keep the approved and as-built drawings, plus the designer’s record of the area allowed for panels, the assumed weight of the panels and mounting system, and the fixing locations. Once you choose the equipment, have a structural engineer compare its specifications with the original assumptions. If there is no documented allowance for solar, ask the engineer to assess the drawings and the roof as built before installation.